Page 63 - Tussen binnenstad en spoor - Leuven 2003
P. 63

61

__ THE POSITIONING OF A BUILDING                        that building with the car park under the KBC         refuge on a daily basis. In building the infrastruc-
                                                        complex. So there are only cars coming out of the     ture under the Martelarenplein it was opted to
A designer must always start from the specific          car park at the Provincial Government Building        accommodate the car, while the problem of bike
nature of the environment. The question always          level. The entrance to the car park is located        storage was put in the backburner and shifted to
remains how a building is embedded in the site;         closer to the station through a narrow lane par-      the location of the private investor. The city
how, at first glance, difficult preconditions are not   allel to the tunnel. The level difference was used    council had asked for a parking facility to accom-
perceived as a hindrance, but constitute precisely      so that pedestrians crossing would not be incon-      modate no fewer than 4,000 cyclists, which comes
the enriching components of the project. Choices        venienced by cars driving into the car park.          down to an area of 6,000 m2. In the preliminary
must be made to nearly give an evidence to the          Eliminating the conflict situation of incoming cars   design phase (May 2002), it was opted to create a
project while taking up the proposed building plot.     and pedestrians without disturbing the topog-         three-storey bicycle shelter situated as close as
                                                        raphy of the ground in a brutal manner, was an        possible to the station. The final solution went
Whoever casts a superficial glance at the proposal      important urban planning premise for Samyn. The       much further than an architectonic approach;
of Samyn and Partners will be inclined to label the     difference in level between the Provincial            namely, a town planning choice, where quality
project as a purely architectonic solution that         Government Building and the station is dealt with     and safety factors were decisive elements.
takes little account of the town planning condi-        by providing an inclination of 8% on both sides,
tions. Upon closer scrutiny of the project, how-        with a horizontal area between them where trees       Samyn and the client opted for a bicycle shelter on
ever, it becomes apparent that Samyn did analyse        are planted. The area between the building and        one level along the entire length of the project. This
numerous decisive elements of the location care-        the Tiensevest is a public park; planting tall trees  choice has more than one advantage. The pertinent
fully so as to position his building properly on this   provides continuity with the greenery along the       question as to which floor people left their bike on
narrow building strip. Unlike the proposal of a         moats. It becomes a pleasant public esplanade         is no longer necessary; the ever-recurring orienta-
project developer from 1995, Samyn respects the         with greenery and benches for people to sit, a        tion problems in underground parking facilities
basic configuration given in the proposal of the        connection between the Provincial Government          does not count for much here among cyclists. A
Urban Project. He makes a variant of the                Building and the station without using stairs.        second, and even more important advantage is that
sequence of construction volumes, but not by            Along this sloping side, the station is provided      the space for bicycles has daylight, and that the
placing them freestanding. He wants to stress the       with an information centre.                           frightening feeling of dark basements is avoided.
border between the tracks and the building plot                                                               The various exits for cyclists on to the esplanade
in no uncertain terms. It is a succession of eleven     The design also provides a solution for a very dif-   spread out the movements over the entire length of
identical bays, whereby very great transparency         ficult element, i.e. integrating the existing signal  the building.
will be achieved by introducing atria through the       cabin on the right side of the station. For tech-     There are two stories under the bicycle shelter
office volumes. He has opted for a taut repetition,     nical reasons, the building cannot be demolished.     that house technical rooms and a car park for 690
which will confer a mastered neutrality on the          This signal cabin of no architectonic interest is     cars. The upper parking level (–2) has natural light
whole. The building is developed in a linear struc-     entirely covered by a single floor building, and at   on the west side (Tiensevest), the lower level (–3)
ture which positions itself rather reservedly with      the same time a direct connection is made on the      on both sides. Designing parking facilities with
respect to the tower structure of the Provincial        same level between the integrated pedestrian          natural light is an advantage not only for energy-
Government Building. The point of departure of          bridge of the new platform covering and the           saving reasons, but also because it gives the user
Marcel Smets to mark the end point of the new           bicycle shelters under the building. This is          a greater sense of security. Natural ventilation can
construction with an important public building is       undoubtedly an improvement in comfort inside          be used for the bicycle shelter and the car park,
respected in the proposal. The KBC building does        this station area, certainly in foul weather.         which is another energy-saving factor. Just as
not compete in height with the Provincial                                                                     Solà-Morales designed the car park under the
Government Building.                                    The bicycle is of crucial importance in order to      Martelarenplein with the greatest care, so Samyn
                                                        maintain a historic city centre liveable. And in a    opted for parking facilities with a qualitative spa-
The width of the plot was really determining in         university town like Leuven, it is used extensively   tial experience where a claustrophobic, unsafe
terms of technical traffic-related solutions. To opti-  as a means of transport. In Leuven people realise     feeling is avoided.
mise the flow of traffic near the square in front of    that a station site is more than a transfer point, a
the Provincial Government Building, it was              convergence of train and bus lines; it is a place
decided to connect the underground car park of          where thousands of bicycles must find temporary