Page 63 - Tussen binnenstad en spoor - Leuven 2003
P. 63
61
__ THE POSITIONING OF A BUILDING that building with the car park under the KBC refuge on a daily basis. In building the infrastruc-
complex. So there are only cars coming out of the ture under the Martelarenplein it was opted to
A designer must always start from the specific car park at the Provincial Government Building accommodate the car, while the problem of bike
nature of the environment. The question always level. The entrance to the car park is located storage was put in the backburner and shifted to
remains how a building is embedded in the site; closer to the station through a narrow lane par- the location of the private investor. The city
how, at first glance, difficult preconditions are not allel to the tunnel. The level difference was used council had asked for a parking facility to accom-
perceived as a hindrance, but constitute precisely so that pedestrians crossing would not be incon- modate no fewer than 4,000 cyclists, which comes
the enriching components of the project. Choices venienced by cars driving into the car park. down to an area of 6,000 m2. In the preliminary
must be made to nearly give an evidence to the Eliminating the conflict situation of incoming cars design phase (May 2002), it was opted to create a
project while taking up the proposed building plot. and pedestrians without disturbing the topog- three-storey bicycle shelter situated as close as
raphy of the ground in a brutal manner, was an possible to the station. The final solution went
Whoever casts a superficial glance at the proposal important urban planning premise for Samyn. The much further than an architectonic approach;
of Samyn and Partners will be inclined to label the difference in level between the Provincial namely, a town planning choice, where quality
project as a purely architectonic solution that Government Building and the station is dealt with and safety factors were decisive elements.
takes little account of the town planning condi- by providing an inclination of 8% on both sides,
tions. Upon closer scrutiny of the project, how- with a horizontal area between them where trees Samyn and the client opted for a bicycle shelter on
ever, it becomes apparent that Samyn did analyse are planted. The area between the building and one level along the entire length of the project. This
numerous decisive elements of the location care- the Tiensevest is a public park; planting tall trees choice has more than one advantage. The pertinent
fully so as to position his building properly on this provides continuity with the greenery along the question as to which floor people left their bike on
narrow building strip. Unlike the proposal of a moats. It becomes a pleasant public esplanade is no longer necessary; the ever-recurring orienta-
project developer from 1995, Samyn respects the with greenery and benches for people to sit, a tion problems in underground parking facilities
basic configuration given in the proposal of the connection between the Provincial Government does not count for much here among cyclists. A
Urban Project. He makes a variant of the Building and the station without using stairs. second, and even more important advantage is that
sequence of construction volumes, but not by Along this sloping side, the station is provided the space for bicycles has daylight, and that the
placing them freestanding. He wants to stress the with an information centre. frightening feeling of dark basements is avoided.
border between the tracks and the building plot The various exits for cyclists on to the esplanade
in no uncertain terms. It is a succession of eleven The design also provides a solution for a very dif- spread out the movements over the entire length of
identical bays, whereby very great transparency ficult element, i.e. integrating the existing signal the building.
will be achieved by introducing atria through the cabin on the right side of the station. For tech- There are two stories under the bicycle shelter
office volumes. He has opted for a taut repetition, nical reasons, the building cannot be demolished. that house technical rooms and a car park for 690
which will confer a mastered neutrality on the This signal cabin of no architectonic interest is cars. The upper parking level (–2) has natural light
whole. The building is developed in a linear struc- entirely covered by a single floor building, and at on the west side (Tiensevest), the lower level (–3)
ture which positions itself rather reservedly with the same time a direct connection is made on the on both sides. Designing parking facilities with
respect to the tower structure of the Provincial same level between the integrated pedestrian natural light is an advantage not only for energy-
Government Building. The point of departure of bridge of the new platform covering and the saving reasons, but also because it gives the user
Marcel Smets to mark the end point of the new bicycle shelters under the building. This is a greater sense of security. Natural ventilation can
construction with an important public building is undoubtedly an improvement in comfort inside be used for the bicycle shelter and the car park,
respected in the proposal. The KBC building does this station area, certainly in foul weather. which is another energy-saving factor. Just as
not compete in height with the Provincial Solà-Morales designed the car park under the
Government Building. The bicycle is of crucial importance in order to Martelarenplein with the greatest care, so Samyn
maintain a historic city centre liveable. And in a opted for parking facilities with a qualitative spa-
The width of the plot was really determining in university town like Leuven, it is used extensively tial experience where a claustrophobic, unsafe
terms of technical traffic-related solutions. To opti- as a means of transport. In Leuven people realise feeling is avoided.
mise the flow of traffic near the square in front of that a station site is more than a transfer point, a
the Provincial Government Building, it was convergence of train and bus lines; it is a place
decided to connect the underground car park of where thousands of bicycles must find temporary