Page 64 - Tussen binnenstad en spoor - Leuven 2003
P. 64

62

__ THE ARCHITECTONIC DEVELOPMENT                         spatiality in most office buildings is completely        building. There are wood sliding panels on the
                                                         absent here. Samyn has designed a building where         outer façades and Venetian blinds on the inner
The long construction volume was given rhythm in         space is experienced with extensive fluidity, as the     façades of the atria to provide optimal shading
various ways to avoid coming across as one contin-       strict boundary between inner and outer space is         from the sun.
uous, monotonous strip. The base of the building         very vague.
is 280 metres long and 29.40 metres wide. It con-                                                                 In the project, Samyn achieves an extremely clear
sists of three storeys over the entire length. The       Six metal emergency stairways have been installed        concept. In fact, the ground plan is a taut structure
main entrance of the building is situated on the         on the façade on the Tiensevest side, which project      with flexibility as to possible use. Such flexibility is
station side, between the signal cabin and the first     about six metres from the façade. These elegantly        not determined by moveable aspects but by the
main volume. It is a fully glazed space with a           designed stair structures run through to the lower-      concept which will offer the building owner various
double height. The first two stories of the base are     most basement level so that the car park can be          possibilities. Like his contemporaries Jean Nouvel
less deep because there is a double-height gallery       evacuated. The façade is given rhythm on the rail        and Dominique Perrault, Philippe Samyn wants to
on the ground floor on the Tiensevest side. It is a      side by means of eleven vertical technical shafts        leave form behind and make a new architecture
long gallery that is seen as a covered street but        which contain alternatingly sanitary facilities and the  from other possibilities of materials and construc-
with an outdoor climate, which affords a view on         vertical circulation. These tubes function as wind       tion. The designed project is an important pivoting
the esplanade with the trees. These two stories can      bracings for the entire building. A technical room is    point in Samyn’s work. It reflects his ambition for an
be occupied freely, and can even function sepa-          provided for each volume, where the walls have           architecture with controlled classical aura. Technical
rately from the rest of the building. The third storey   been covered by overgrowth, which is also applied        know-how and computer technology are not
takes up the entire surface area. Eleven office vol-     on the roof surfaces. The building will be seen as a     deployed to produce a spectacular, showy
umes, each with three stories, are placed on this        green surface from the upper floors of the               building. This building is not an eye-catcher, no
continuous base. The useful floor space of the           Provincial Government Building. Together with the        constructed visual logo for a company. The office
offices is 29.40 x 15 metres. The eleven volumes of      new trees on the Tiensevest, this will form a visual     building must first and foremost offer possibilities,
the upper building are connected by footbridges          whole in the long run. Instead of one voluminous         the flexibility to organise an appropriate and
on every level on the east side, i.e. the side of the    and clumsy technical floor, Samyn opted for a solu-      smooth work structure, and not to hinder future
rail tracks.                                             tion where the technical infrastructure is integrated    developments. On the other hand, it must become
                                                         in the building concept in a far more obvious            a pleasant workplace for more than one thousand
Between the office volumes are 9-metre wide atria.       manner. At the same time, these technical rooms          people, a building that is more than the delivery of
This makes it possible to open the vertical windows      are used to give extra rhythm to the construction        available square metres.
of the offices on the quiet interior spaces instead      volume – which will be best appreciated from the
of the noisy street and railway sides. The interior      other side of the tracks, i.e. from Kessel-Lo.           MARC DUBOIS (*1950)
windows on the floor level have a mullion, a solu-                                                                Architect, professor Department Architecture Sint-Lucas
tion which will give the interior a rather calm, nearly  Samyn has always endeavoured to design as light          Ghent & Brussels. From 1977 unwards till 1995
classical look. The roofs of the atria are in glass and  structures as possible. This unremitting quest for       member of the Royal Commission of Monuments and
can be opened halfway, in the event of fire or on        light and elegant structures becomes an important        Sites. Advisor for the Mies van der Rohe Award Barcelona
extremely warm days. This makes it possible to use       theme in the project. All façades of the offices are     (official architecture prize of the European Community).
natural ventilation, an important component in the       designed as wooden façade panels. The wood in            From 1993 member of CICA (International Committee
design of durable buildings. Another important           the façade and carpentry is protected from rain by       of Architectural Critics).
advantage is that the atria are not seen as interior     a cornice and by gangways on each floor, which           From 1999 vice-president of the Commission Architecture
but as exterior spaces. The result is that, according    run round the entire building. The gangways are          and Design of the Flemish Community.
to fire regulations, the upper three floors are con-     moreover decisive for the composition and final
sidered as a low building with all the advantages        visual experience of the exterior of the building. All
thereof. It is not necessary to install superfluous      exterior and interior joinery work is in wood. Next
and expensive-, fire-resistant doors in this building.   to hard materials such as steel and glass, wood will
The compartmentalisation which precludes any             create a special atmosphere inside and outside the
   59   60   61   62   63   64   65   66   67   68   69