Page 64 - Tussen binnenstad en spoor - Leuven 2003
P. 64
62
__ THE ARCHITECTONIC DEVELOPMENT spatiality in most office buildings is completely building. There are wood sliding panels on the
absent here. Samyn has designed a building where outer façades and Venetian blinds on the inner
The long construction volume was given rhythm in space is experienced with extensive fluidity, as the façades of the atria to provide optimal shading
various ways to avoid coming across as one contin- strict boundary between inner and outer space is from the sun.
uous, monotonous strip. The base of the building very vague.
is 280 metres long and 29.40 metres wide. It con- In the project, Samyn achieves an extremely clear
sists of three storeys over the entire length. The Six metal emergency stairways have been installed concept. In fact, the ground plan is a taut structure
main entrance of the building is situated on the on the façade on the Tiensevest side, which project with flexibility as to possible use. Such flexibility is
station side, between the signal cabin and the first about six metres from the façade. These elegantly not determined by moveable aspects but by the
main volume. It is a fully glazed space with a designed stair structures run through to the lower- concept which will offer the building owner various
double height. The first two stories of the base are most basement level so that the car park can be possibilities. Like his contemporaries Jean Nouvel
less deep because there is a double-height gallery evacuated. The façade is given rhythm on the rail and Dominique Perrault, Philippe Samyn wants to
on the ground floor on the Tiensevest side. It is a side by means of eleven vertical technical shafts leave form behind and make a new architecture
long gallery that is seen as a covered street but which contain alternatingly sanitary facilities and the from other possibilities of materials and construc-
with an outdoor climate, which affords a view on vertical circulation. These tubes function as wind tion. The designed project is an important pivoting
the esplanade with the trees. These two stories can bracings for the entire building. A technical room is point in Samyn’s work. It reflects his ambition for an
be occupied freely, and can even function sepa- provided for each volume, where the walls have architecture with controlled classical aura. Technical
rately from the rest of the building. The third storey been covered by overgrowth, which is also applied know-how and computer technology are not
takes up the entire surface area. Eleven office vol- on the roof surfaces. The building will be seen as a deployed to produce a spectacular, showy
umes, each with three stories, are placed on this green surface from the upper floors of the building. This building is not an eye-catcher, no
continuous base. The useful floor space of the Provincial Government Building. Together with the constructed visual logo for a company. The office
offices is 29.40 x 15 metres. The eleven volumes of new trees on the Tiensevest, this will form a visual building must first and foremost offer possibilities,
the upper building are connected by footbridges whole in the long run. Instead of one voluminous the flexibility to organise an appropriate and
on every level on the east side, i.e. the side of the and clumsy technical floor, Samyn opted for a solu- smooth work structure, and not to hinder future
rail tracks. tion where the technical infrastructure is integrated developments. On the other hand, it must become
in the building concept in a far more obvious a pleasant workplace for more than one thousand
Between the office volumes are 9-metre wide atria. manner. At the same time, these technical rooms people, a building that is more than the delivery of
This makes it possible to open the vertical windows are used to give extra rhythm to the construction available square metres.
of the offices on the quiet interior spaces instead volume – which will be best appreciated from the
of the noisy street and railway sides. The interior other side of the tracks, i.e. from Kessel-Lo. MARC DUBOIS (*1950)
windows on the floor level have a mullion, a solu- Architect, professor Department Architecture Sint-Lucas
tion which will give the interior a rather calm, nearly Samyn has always endeavoured to design as light Ghent & Brussels. From 1977 unwards till 1995
classical look. The roofs of the atria are in glass and structures as possible. This unremitting quest for member of the Royal Commission of Monuments and
can be opened halfway, in the event of fire or on light and elegant structures becomes an important Sites. Advisor for the Mies van der Rohe Award Barcelona
extremely warm days. This makes it possible to use theme in the project. All façades of the offices are (official architecture prize of the European Community).
natural ventilation, an important component in the designed as wooden façade panels. The wood in From 1993 member of CICA (International Committee
design of durable buildings. Another important the façade and carpentry is protected from rain by of Architectural Critics).
advantage is that the atria are not seen as interior a cornice and by gangways on each floor, which From 1999 vice-president of the Commission Architecture
but as exterior spaces. The result is that, according run round the entire building. The gangways are and Design of the Flemish Community.
to fire regulations, the upper three floors are con- moreover decisive for the composition and final
sidered as a low building with all the advantages visual experience of the exterior of the building. All
thereof. It is not necessary to install superfluous exterior and interior joinery work is in wood. Next
and expensive-, fire-resistant doors in this building. to hard materials such as steel and glass, wood will
The compartmentalisation which precludes any create a special atmosphere inside and outside the