Page 61 - Tussen binnenstad en spoor - Leuven 2003
P. 61

59

The narrow and long building plot situated              the city of Leuven, but the living quality is not      water. Detailed explanations on energy aspects
between the station and the new Provincial              determined solely by panoramic vistas or theoret-      are given in a special contribution by Dr. Ir. Arch.
Government House is 60 metres wide between the          ical considerations. It was further noted that         Filip Descamps of the building physics enginee-
railway tracks and the Tiensevest, and 370 metres       developers were not interested in the proposed         ring firm Daidalos in Leuven.
long. On the long side, the plot is delimited by a      ratios of the SPS for this location, and for housing
railway bedding, at a lower level, and the tunnel       in particular. There was a real danger that this plot  Important adjustments were made in the course
trench of the Tiensevest. This tunnel trench forms      would remain an open space for years. The ques-        of the design process. The building became less
a barrier for about half of the plot’s length. An       tion remains whether the proposed programme            long, one bay was left out, thereby extending the
additional source of difficulty is the signal cabin     for this site with 8,000 m2 of office space, was not   distance to the Provincial Government Building.
near the station, a building that had to be inte-       estimated too low. This ratio may have been a          The total built volume was lowered by burying the
grated in the project.                                  realistic forecast in the mid 1990s, certainly when    volume deeper in the ground. This created a
                                                        the major Philips site was being developed in a        better connection on the Tiensevest side, but the
The wide railway yard forms a barrier, it even          provincial city like Leuven. But thanks to the great   lower level of the car park gets less daylight,
marks the border between Leuven and Kessel-Lo.          interest that the government itself created in the     which is a concession on the energy-saving front.
Marcel Smets uses the metaphor of “iron river”          station area, it was to be expected that such a top    It was also decided to connect the car park
for this open space in the urban fabric. Just like a    location would lead to a much higher rate of           (capacity: 690 cars) with the car park of the new
river, a rail location has two banks, and people        occupancy. By comparison with the situation in         Provincial Government Building. Instead of a fully
use bridges and tunnels to cross it. Furthermore,       the Netherlands, such as the station area in the       glazed façade skin, a wooden façade texture was
laid in the 19th century, the railway bedding forms     provincial city of Arnhem, the offer of 8,000 m2 of    chosen for the eleven construction volumes. The
a break that people will continue to experience         office space for the private sector is far too small   verticality of the façade composition, which
physically. The banks in Leuven will always con-        to attract important investors. The biggest draw-      Samyn wants to include as an essential compo-
tinue to be peripheral areas, edges, even with two      back raised against proposed plan had to do with       nent of the architectural tradition, was enhanced.
new connections over the tracks. Edges can              the expansion of the office space and the elimina-     Unlike Byrne in the provincial government house,
hardly be turned into a new central area in an          tion of the living function in this area. According    he did not opt for a modernist, horizontal type of
urban fabric; the border remains an irreversible        to the defendants of the urban project, such a         window. With the stress on verticality, he wants to
element when considering solutions. The form,           change would be seen as a return to the old            include a centuries-old tradition in contemporary
topography and adjacent structure determine the         urban development practices which is far too           architecture. In a city with a verticality icon, i.e. the
possibilities of the site in a radical way.             much based on pragmatic points of view.                town hall, this is a deliberate choice, according to
                                                                                                               Samyn. The architect’s premise is not the new
For this narrow strip, the Urban Project Team           __ A YEAR OF INTENSIVE DESIGN PROCESS                  against the old, but architecture seen as an ele-
opted for a building with free standing volumes                                                                ment of continuity.
with a total surface of 24,000 m2, only a third of      The phase between the first sketches in the
which, i.e. 8,000 m2, could be used as office           beginning of 2002, and the final design, pre-          The pronounced sloping roofs in the preliminary
space. The SPS, the elaboration of the “Urban           sented in June 2003, was a very intensive period       design were replaced by a less flamboyant roof
Project,” provided for mixing work, shopping and        for the design team. A multi-disciplinary design       structure. The way in which the existing signal
living. Can a certain building location fit in a theo-  approach proved pivotal: a permanent develop-          cabin was integrated in the whole changed radi-
retically postulated intended use? Can a design         ment of the design on the basic idea of “People –      cally. One very fascinating aspect in the design
be developed with one third allocated to living         Planet – Profit” was used as the underlying prin-      phase is trying to find the most efficient structural
space, without taking into account a noise level of     ciple. Samyn describes the PPP principle as            arrangement whereby the bay width, distance
85 decibels from the trains passing by? One char-       striving for balance between the three main            between columns and column diameter are con-
acteristic element for railway environments is the      parameters in the process, i.e. the human, eco-        stantly reconsidered to arrive at a balanced pro-
great presence of dust, which virtually excludes        logical and financial. The various aspects of          portion. Optimising the structure is a leitmotif in
opening the windows. The question must there-           durable construction are integrated therein: func-     Samyn’s endeavour to give the building a light
fore be raised whether this strip, immediately          tional durability, minimal and ecologically justified  and transparent character and not to mortgage
adjacent to the tracks, is suited for housing.          use of material, rational use of energy, a mainte-     the future use.
Naturally, such housing will afford a fine view of      nance friendly concept and a rational use of
   56   57   58   59   60   61   62   63   64   65   66