The tunnelling and revamping of the Martelaren-         station with the accompanying offices for De Lijn     than placing an order; the enthusiasm is geared to
plein, the adjoining car park and connection with       are the initial results of this ambitious urban       erecting something special that goes farther than
the train tracks and the construction of the bus ter-   project. Other large-scale actions have been car-     producing buildings as an investment operation.
minal for De Lijn are the successful results of a       ried out or will get underway soon: the new           The ambition of the client is not only to erect a
patient process between many partners, headed           Provincial Government Building of Flemish             beautiful building; this building must also be an
by the Urban Project Team and Manuel de Solà-           Brabant and the new Flemish Administrative            example of an ecological and low-energy
Morales 3. This Barcelona-based architect had           Centre (FAC). They even form the two end poles        approach. A project where durability is of pivotal
made an international name for himself with a           of the current development of the project round       importance. The client set high standards and
number of highly complex urban operations               the station on the Leuven side.                       went looking for an architect who could provide
including the restructuring of the “Passeig del                                                               the right answer to a complex programme of
Moll de la Fusta“ in Barcelona (1983-’87).              The young Province of Flemish Brabant with            requirements, bring renovation to an area of office
Solà-Morales’ approach to complicated urban             Leuven as its centre opted for a location on the      buildings, and who had a team for supervising
development tasks is internationally appreciated –      Tiensevest. In 1998, an international competition     such a large scale project in optimal manner.
a design strategy where the concrete feasibility        was held, won by the Portuguese architect
always takes priority. He was the right figure to       Gonçalo Byrne in cooperation with the WIT Group       After a round of consultations, he decided to go
give this complicated problem shape. The tunnel         and the engineer Dirk Jaspaert. The volumetric        with the architectural firm of Samyn and Partners,
was built in cooperation with the architectural firm    analysis in the urban design and the SPS was          in a temporary association with ARCHI+I.
Studiebureau S.W.K. The building for De Lijn was        fixed: a tower structure as the visual delimitation   Philippe Samyn has produced enthralling work in
erected in cooperation with Atelier 33.                 on the south side of the development area. The        recent years, that has been internationally
                                                        design has a clear composition, a vertical and hori-  acclaimed and published 4. Samyn has distin-
The works on the tunnel between the Tiense and          zontal building mass. The complex is to be inau-      guished himself in particular in office buildings
Diestse Vest started in 1998. The project com-          gurated in the spring of 2003.                        with a series of exceptional structures. Already in
prised a City parking facility with 388 places, a car   The Flemish Community took the important deci-        the 1980s, he would concentrate on buildings with
park comprising two floors. It is no traditional        sion to establish the VAC near the station, as had    a double façade structure: the concept of the
underground car park, no anonymous “black               been done in Hasselt. In 2000, a competition was      double skin with both energy-saving and architec-
box.” This car park was designed with extreme           held and in October 2002, the firm of Zenghelis &     tonic possibilities, the introduction of the double
precision to achieve a high quality end result. The     Gigantes was chosen. This building on the north       skin as an ecological solution. Samyn created the
designers attached much importance in having            side is given a vertical tower volume and forms a     first building in Belgium with this principle, i.e. the
both daylight and the right measure of artificial       visual relation with the Provincial Government        Brussimmo office complex in the Leopoldswijk in
light in the car park. First, it had to be a quality    Building.                                             Brussels (1989-1993) 5. He worked out the double
public space that was pleasant to enter. It is a car                                                          skin concept further in the Dupuis office building
park with a surprising spatial quality, by far the      That important private companies wanted to            in Marcinelle (1993-1995). The concept of an elon-
most beautiful parking facility built in Belgium in     follow the government’s example was pending,          gated office building, where the office part is
recent years. By situating the entrance of the car      and in fact it was encouraged by the Flemish          alternately combined with an interior atrium, pro-
park at level – 2 in the tunnel, and the existing dif-  Community as a matter of policy. A new building       vides an extremely clear structure with a sur-
ference in height of about eight metres between         directly connected to the public transport network    prising spatial experience. This building can be
the station and the Provincial Government               is the answer to the mobility problem.                considered as a prototype that he would work out
Building, the length of the tunnel trench on the                                                              further in other projects. Although very different
Tiensevest side was extended substantially, and         __ CHOICE OF ARCHITECT                                in scale, this project already contained the
the boulevard was definitively divided into two                                                               impulse for the considered project.
street sides – a break in the urban fabric.             It is often forgotten that interesting building can
                                                        only come into being thanks to ambitious clients.
The government set the example in Leuven. The           The world “building owner” is here more appro-
tunnel, car park, layout of the square and the bus      priate, because building on a heritage is more