Page 207 - THE FIRE STATION
P. 207

205

11,76 %   Production of heat via boilers          Fig. 8: Simulation of the system’s functioning on a typical summer’s day
71,45 %   Production of heat via a CHP system     (production of heat and power evaluated by the Cogencalc© software
16,79 %   Production of heat via solar panels     package). The heat requirements of the absorption chiller account for
-61,83 %  Heat needed for the absorption machine  38% of total hot water requirements. The remainder is used for the
-38,17 %  Heat needed for producing hot water     building’s sanitary facilities. Total hot water demand is thus covered by
                                                  means of solar thermal panels (+/- 17 %), the CHP system (+/- 72 %) and
                                                  supplementary boilers (+/- 11 %).

Fig. 9: Building energy performance unit (BEPU) of the Charleroi fire station.
(Orange: BEPU 13 of the “miscellaneous” zone – Blue: BEPU of the “office” zone – Green: BEPU of the “production” zone).