Page 249 - AGC_MultiLingue_HD.indd
P. 249
249
Responsible parties
Reference
title
BReeam europe: ofices Criteria
Number of BReeam credits available
total BReeam credits achieved
BoPRo
POL 5
Flood risk
Two credits where evidence provided demonstrates that the assessed development is located in a zone deined as having a low annual prob- ability of looding. One credit where evidence provided demonstrates that the assessed development is located in a zone deined as having a medium or high annual probability of looding AND the ground level of the build- ing, car parking and access is above the design lood level for the site’s location. One further credit where evidence provided demonstrates that surface water run-off attenuation measures are speciied to minimize the risk of localized looding, resulting from a loss of lood storage on site due to development.
3
2
sai & Beai
POL 6
Minimizing watercourse pollution
One credit where evidence provided demonstrates that effective on-site treatment such as Sustainable Drainage Systems (SUDs) or oil separators have been speciied in areas that are or could be a source of watercourse pollution.
1
1
sai & Beai / Fti
POL 7
Reduction of night-time light pollution
One credit where evidence provided demonstrates that the external light- ing design is in compliance with best-practice guidance from the Interna- tional Commission on Illumination (CIE).
1
1
daidalos
POL 8
Noise attenuation
One credit where evidence provided demonstrates that new sources of noise from the development do not give rise to the likelihood of complaints from existing noise-sensitive premises and amenity or wildlife areas that are within the locality of the site.
1
1
INNOVATION
n/a
MAN 3
Construction site impacts
One additional innovation credit where evidence provided demonstrates that all of the items a-g listed above are achieved and at least 80% of site timber is responsibly sourced and 100% is legally sourced.
1
0
sai / daidalos / Fti
hEA 1
Daylighting
One additional innovation credit where evidence provided demonstrates that at least 80% of the ofice loor area has achieved increased daylight levels. In addition, in retail developments, at least 50% by loor area of the common spaces and 35% by loor.
1
0
sai & Beai / Van Roey
hEA 9
Volatile Organic Com- pounds (VOCs)
One additional innovation credit where evidence provided demonstrates that all internal inishes and ittings speciied in the building have been tested against and meet the relevant standards for Volatile Organic Com- pound (VOC) emissions.
1
1
daidalos / Fti
ENE 1
Energy eficiency
One additional innovation credit where an energy modelling carried out using Dynamic Simulation Modelling software demonstrates the building is designed to be a carbon-neutral building (i.e., in terms of building services energy demand).Two additional innovation credits can be awarded where evidence provided demonstrates the building is designed to be a true
zero carbon building (in terms of building services and operational energy demand).
2
0
daidalos
ENE 5
Low or Zero Carbon (LZC) technologies
One additional innovation credit where evidence provided demonstrates that local LZC energy technology has been installed in line with the recom- mendations of the above feasibility study and this method of supply results in a 20% reduction in the building.
1
0
sai & Beai
TRA 3
Alternative modes of transport
One additional innovation credit where evidence provided demonstrates that two of the above options have been implemented.
1
1
Fti
WAT 2
Water meter
One additional innovation credit where evidence provided demonstrates that sub-meters with a pulsed output are itted to enable the metering of individual water-consuming plant or building areas.
1
1
sai & Beai
MAT 1
Materials speciication
One additional innovation credit where evidence provided demonstrates that a nationally recognized LCA tool or the Green Guide to Speciication has been used to evaluate a range of material options for all the building elements.
1
0
sai & Beai / Van Roey
MAT 5
Responsible sourcing of materials
One additional innovation credit where, in addition to the standard BREEAM requirements, 95% of the applicable materials, comprised within the applicable building elements, have been responsibly sourced.
1
0
Van Roey
WST 1
Construction site waste management
Europe 2008: Industrial.
1
0
Fti
POL 4
NOx emissions of heating source
One additional innovation credit where evidence provided demonstrates that the plant installed to meet the building’s space heating demand has zero dry NOx emission levels at 0% excess O2.
1
0


































































































   247   248   249   250   251