114 January 2013
Plan for the concrete core activation: concrete slab above the second  oor 2012
2014
2013-01
Site preparation and groundwork
Foundation posts and foundation basement
Massive concrete slabs and columns on ground level; shell work basement First- oor slab
Concrete core activation in  oor slabs Second- oor slab
Roof slab
Assembly main staircase
Steel structure gallery
Roof covering
exterior woodwork and bamboo facade covering
Wooden terraces and interior gardens Second facade in glass panels
technical installations in shafts or under the raised  oor
Installation of raised  oors
Drywall partitions and spray-plaster ceilings
Lifts
Interior woodwork
Wood  ooring and carpet
Kitchen and restaurant
Technical installations in basement; BTES  eld; PV panels
Surround works Delivery