Page 172 - AGC_EN_iBook
P. 172
172
21°C high Water Temperature Schedule Value
18°C Low Water Temperature Schedule Value
Inlet Water temperature
Cooling
Control temperature (mat,mRt,etc.)
System Off
21°C Low Water Temperature Schedule Value
24°C
high Water Temperature Schedule Value
Fig. 1.thermally active slab with water owing through it at a constant rate: control temperatures (energyPlus engineering Reference – the Reference to energyPlus Calculations, 2013)
September 2013
2012 2013
Site preparation and groundwork
Foundation posts and foundation basement
2014
2013-09
Massive concrete slabs and columns on ground level; shell work basement First- oor slab
Concrete core activation in oor slabs Second- oor slab
Roof slab
Assembly main staircase
Steel structure gallery
Roof covering
Exterior woodwork and bamboo facade covering
Wooden terraces and interior gardens
Second facade in glass panels
technical installations in shafts or under the raised oor
Installation of raised oors
Drywall partitions and spray-plaster ceilings
Lifts
Interior woodwork
Wood ooring and carpet
kitchen and restaurant
technical installations in basement; BteS eld; PV panels
Surround works
Delivery